Installation
P410 HYBRID TRANSMISSION / TRANSAXLE: TCM: INSTALLATION
1. INSTALL TRANSMISSION CONTROL ECU ASSEMBLY
(a) Engage the 2 claws to install the transmission control ECU assembly to the ECU integration box.
2. INSTALL ECU INTEGRATION BOX Installation
3. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY Installation
4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY Installation
5. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL
6. INSTALL DECK FLOOR BOX RH Installation
7. INSTALL REAR NO. 3 FLOOR BOARD Installation