Installation
2GR-FE IGNITION: IGNITION COIL AND SPARK PLUG: INSTALLATION
1. INSTALL SPARK PLUG
(a) Install the 6 spark plugs.
Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)
2. INSTALL IGNITION COIL
(a) Install the 6 ignition coils with the 6 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 6 ignition coil connectors.
(c) Install the 2 wire harness brackets with the 2 bolts.
(d) Connect the 3 wire harness clamps.
3. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation
4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
5. CONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
6. ADD ENGINE COOLANT Service and Repair
7. INSPECT FOR COOLANT LEAK Testing and Inspection
8. INSTALL NO. 1 ENGINE UNDER COVER Installation
9. INSTALL V-BANK COVER SUB-ASSEMBLY Installation