Operation CHARM: Car repair manuals for everyone.

Removal





2GR-FE IGNITION: IGNITION COIL AND SPARK PLUG: REMOVAL

1. REMOVE V-BANK COVER SUB-ASSEMBLY Removal

2. PRECAUTION

NOTICE:
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work Service Precautions.

3. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

NOTICE:
Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt pretensioner activation.

4. REMOVE NO. 1 ENGINE UNDER COVER Removal

5. DRAIN ENGINE COOLANT Service and Repair

6. REMOVE AIR CLEANER CAP SUB-ASSEMBLY Removal

7. REMOVE INTAKE AIR SURGE TANK ASSEMBLY Removal

8. REMOVE IGNITION COIL





(a) Disconnect the 3 wire harness clamps.

(b) Remove the 2 bolts and 2 wire harness brackets.





(c) Disconnect the 6 ignition coil connectors.









(d) Remove the 6 bolts and 6 ignition coils.

9. REMOVE SPARK PLUG





(a) Remove the 6 spark plugs.