Installation
NETWORKING: NETWORK GATEWAY ECU: INSTALLATION
1. INSTALL NETWORK GATEWAY ECU
(a) Install the network gateway ECU with the 2 nuts.
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
(b) Connect the network gateway ECU connector.
2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY RH Installation
3. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY Installation
4. INSTALL LOWER INSTRUMENT PANEL Installation
5. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY Installation
6. INSTALL INSTRUMENT SIDE PANEL RH Installation
7. INSTALL COWL SIDE TRIM BOARD RH Installation
8. INSTALL FRONT DOOR SCUFF PLATE RH Installation
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
10. CHECK SRS WARNING LIGHT
Diagnosis System