Main Relay (Computer/Fuel System): Testing and Inspection
1UR-FE ENGINE CONTROL: RELAY: ON-VEHICLE INSPECTION
1. INSPECT INTEGRATION RELAY (IG2)
(a) Measure the resistance of the IG2 MAIN fuse.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the IG2 MAIN fuse.
(b) Measure the resistance of the ignition relay No. 2 (IG2) circuit.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the integration relay.
2. INSPECT INTEGRATION RELAY (EFI)
(a) Measure the resistance of the EFI No. 1 fuse.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the EFI No. 1 fuse.
(b) Measure the resistance of the EFI MAIN relay circuit.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the integration relay.
3. INSPECT INTEGRATION RELAY (A/F)
(a) Measure the resistance of the A/F fuse.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the A/F fuse.
(b) Measure the resistance of the A/F sensor heater relay.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the integration relay.
4. INSPECT FUEL PUMP RELAY (F/PMP)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the result is not as specified, replace the fuel pump relay.