Inspection
HEATING / AIR CONDITIONING: COMPRESSOR (for 1AR-FE): INSPECTION
1. INSPECT W/PULLEY COMPRESSOR ASSEMBLY(SOLENOID VALVE)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
If the resistance is not as specified, replace the compressor.