Inspection
HYDRAULIC BODY-MOTION CONTROL SYSTEM
ACCUMULATOR : Inspection
INSPECTION AFTER REMOVAL
- O-ring must be free of scratches and damage.
- Pipe and tube must be free of scratches and damage.
INSPECTION AFTER INSTALLATION
Check oil leakage, twists, deformation, contact with other parts, and loose connections.
ADJUSTMENT AFTER INSTALLATION
Perform air bleeding. Air Bleeding Method.