Installation
2UZ-FE COOLING: THERMOSTAT:
INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Insert the thermostat into the water inlet housing with the jiggle valve facing straight upward.
HINT: The jiggle valve may be set within 30° of either side of the prescribed position.
2. INSTALL WATER INLET HOUSING
(a) Install the water inlet with the 3 nuts.
Torque: 19 Nm (195 kgf-cm, 14 ft-lbf)
3. ADD ENGINE COOLANT Service and Repair
4. INSTALL V-BANK COVER SUB-ASSEMBLY
(a) Install the V-bank cover sub-assembly with 2 cap nuts.
Torque: 7.5 Nm (80 kgf-cm, 66 in-lbf)