Power Mirror Control System (w/ Memory)
MIRROR: POWER MIRROR CONTROL SYSTEM (w/ Memory): ECU Power Source Circuit
ECU Power Source Circuit
DESCRIPTION
This is the power source circuit for the memory mirror ECU assembly.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
1. CHECK FUSE
(a) Remove the fuses from the instrument panel J/B assembly and engine room J/B assembly.
(b) Check the continuity.
Standard resistance:
Below 1 Ohms
NG -- REPLACE FUSE
OK -- Continue to next step.
2. CHECK OUTER MIRROR CONTROL ECU ASSEMBLY
(a) Disconnect the R10 ECU connector.
(b) Measure the voltage according to the value(s) in the table below.
Standard voltage:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
3. CHECK OUTER MIRROR CONTROL ECU ASSEMBLY
(a) Disconnect the R10 ECU connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- CHECK AND REPLACE OUTER MIRROR CONTROL ECU ASSEMBLY