Operation CHARM: Car repair manuals for everyone.

Installation





A760E AUTOMATIC TRANSMISSION: AUTOMATIC TRANSMISSION ASSEMBLY: INSTALLATION

1. INSTALL TORQUE CONVERTER CLUTCH ASSEMBLY

(a) Using a vernier caliper and a straightedge, measure dimension A between the transmission fitting surface of the engine *1 and the converter fitting surface of the drive plate *2. (#)





(b) Aligning the matchmarks on the transmission case and torque converter, engage the splines of the input shaft and turbine runner.





(c) Engage the splines of the stator shaft and stator while turning the torque converter clutch.





NOTICE:
Do not damage the oil seal.

HINT
Turn the torque converter clutch approximately 180°.

(d) Turn the torque converter clutch and align the matchmarks on the torque converter clutch and transmission case to engage the key of the oil pump drive gear into the slot on the torque converter clutch.





NOTICE:
Do not push on the torque converter when aligning the matchmarks.

(e) Using a vernier caliper and a straightedge, measure dimension B shown in the illustration and check that B is greater than A (measured in step (#)).





Standard:

A + 1 mm (0.04 in.) or more

2. INSTALL TRANSMISSION OIL COOLER

(a) Coat 2 new O-rings with ATF, and install them to the transmission oil cooler.





(b) Coat 2 new O-rings with ATF, and install them to the spacer.

(c) Install the transmission oil cooler and spacer to the automatic transmission assembly with the 3 bolts.





Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

3. INSTALL TRANSMISSION CONTROL SHAFT LEVER RH

(a) Install the transmission control shaft to the park/neutral position switch assembly with the nut.





Torque : 16 Nm (163 kgf-cm, 12 ft-lbf)

4. INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR

(a) Install the rear No. 1 engine mounting insulator to the automatic transmission assembly with the 4 bolts.





Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)

5. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY

(a) Confirm that 2 knock pins are on the transmission fitting surface of the engine block before transmission installation.





(b) Apply clutch spline grease to the round of the crankshaft contact surface with the torque converter centerpiece.





Clutch spline grease:

Toyota Genuine Clutch Spline Grease or equivalent

Maximum spread:

About 1 g (0.0353 oz.)

(c) Install the automatic transmission assembly to the engine with the 9 bolts.





Bolts A and B - Torque : 71 Nm (724 kgf-cm, 52 ft-lbf)

Bolt C - Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)

NOTICE:
* Make sure that the mark is as shown in the illustration.
* Do not use excess force to pry on the transmission assembly.
6. INSTALL WATER BY-PASS HOSE

(a) Install the 2 water by-pass hoses to the transmission oil cooler.





(b) Install the water by-pass hose clamp with the bolt.

Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)

7. INSTALL WIRE HARNESS

(a) Install the wire harness clamps to the automatic transmission assembly with the 2 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

8. CONNECT CONNECTOR

(a) Connect the park/neutral start switch connector, transmission wire connector, and 2 transmission revolution sensor connectors.





HINT
Push up the lever until the claw of the transmission wire connector makes a connection sound.





9. INSTALL ENGINE REAR MOUNTING MEMBER

(a) Tilt up the automatic transmission assembly.





(b) Install the bolt and earth wire to the automatic transmission assembly.





Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)

(c) Install the engine rear mounting member to the automatic transmission assembly with the 4 nuts.





Torque : 13 Nm (130 kgf-cm, 10 ft-lbf)

(d) Install the engine rear mounting member to the body with the 4 bolts.





Torque : 26 Nm (265 kgf-cm, 19 ft-lbf)

10. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY

(a) Temporarily tighten the floor shift gear shifting rod sub-assembly with the nut.





Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)

11. INSTALL DRIVE PLATE & TORQUE CONVERTER CLUTCH SETTING BOLT

(a) Install the 6 torque converter clutch setting bolts while holding the crankshaft pulley bolt with a wrench.





Torque : 41 Nm (418 kgf-cm, 30 ft-lbf)

NOTICE:
Install the black colored bolt first, and then the silver colored 5 bolts.

12. INSTALL FLYWHEEL HOUSING SIDE COVER

(a) Install the fly wheel housing side cover to the engine.





NOTICE:
Make sure that the fly wheel housing side cover is securely installed.

13. INSTALL STARTER ASSEMBLY Installation

14. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH Installation

15. INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY Installation

16. FULLY TIGHTEN NO. 1 CENTER SUPPORT BEARING ASSEMBLY Installation

17. INSPECT AND ADJUST NO. 2 AND NO. 3 JOINT ANGLE Installation

18. INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR Installation

19. INSTALL OUTSIDE AIR GUIDE PLATE RH Installation

20. INSTALL FRONT EXHAUST PIPE ASSEMBLY Installation

21. INSTALL OXYGEN SENSOR Installation

22. INSTALL FRONT CENTER FLOOR BRACE Installation

23. INSTALL NO. 1 REAR FLOOR PANEL BRACE Installation

24. INSTALL NO. 2 FLOOR UNDER COVER Installation

25. INSTALL NO. 1 FLOOR UNDER COVER Installation

26. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

27. ADD COOLANT

Testing and Inspection

28. ADD AUTOMATIC TRANSMISSION FLUID

Procedures

29. ADJUST COOLANT

Testing and Inspection

30. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection

31. ADJUST SHIFT LEVER POSITION Adjustments

32. INSPECT SHIFT LEVER POSITION A760E Automatic Transmission

33. CHECK FOR EXHAUST GAS LEAKS Installation

34. INSTALL NO. 2 ENGINE UNDER COVER

35. INSTALL ENGINE UNDER COVER

36. INSTALL ENGINE ROOM SIDE COVER LH Installation

37. INSTALL COOL AIR INTAKE DUCT SEAL Installation

38. RESET MEMORY

Programming and Relearning