Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FE ENGINE CONTROL SYSTEM: THROTTLE BODY: INSTALLATION

1. INSTALL THROTTLE BODY

(a) Install a new throttle body gasket to the intake air surge tank.





(b) Install the throttle body with the 4 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(c) Connect the 2 water by-pass hoses.





(d) Connect the throttle body connector and clamp.





2. INSTALL NO. 1 AIR CLEANER INLET Installation

3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation

4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

(a) Install the air cleaner cap sub-assembly, and connect the 3 bands.





(b) Connect the mass air flow meter connector (*1).





(c) Connect the No. 2 ventilation hose (*2).

(d) Connect the hose band (*3).

(e) Connect the 2 vacuum hoses.





5. INSTALL AIR CLEANER INLET ASSEMBLY Installation

6. ADD ENGINE COOLANT Testing and Inspection

7. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection

8. CHECK FUNCTION OF THROTTLE BODY On-Vehicle Inspection

9. INSTALL ENGINE ROOM SIDE COVER LH Installation

10. INSTALL COOL AIR INTAKE DUCT SEAL Installation

11. INSTALL V-BANK COVER SUB-ASSEMBLY Installation