Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation





2UR-GSE ENGINE MECHANICAL: DRIVE BELT: INSTALLATION

1. INSTALL V-RIBBED BELT

(a) Install the V-ribbed belt as shown in the illustration.





(b) Rotate the V-ribbed belt tensioner pulley counterclockwise, and then remove the bar.

NOTICE:
Check that the drive belt is properly set to each pulley.

(c) Check that the belt is properly positioned on each pulley.





(d) Start the engine and check that the belt turns smoothly and no abnormal noise occurs.

2. INSTALL RADIATOR RESERVE TANK ASSEMBLY

(a) Install the radiator reserve tank assembly with the 2 bolts.





Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)

3. INSTALL NO. 1 AIR CLEANER INLET Installation

4. INSTALL COOL AIR INTAKE DUCT SEAL Installation