Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation





2UR-GSE STARTING: STARTER: INSTALLATION

1. INSTALL STARTER ASSEMBLY

(a) Install the flywheel housing side cover.





(b) Install the terminal lower cover with the nut.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(c) Install the starter assembly with the 2 bolts.





Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)





NOTICE:
Make sure that the flywheel housing cover is as shown in the illustration.

(d) Install the wire harness with the nut.





Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

(e) Connect the starter connector.

(f) Install the terminal upper cover with the 11 claws.





2. INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR

(a) Install the No. 3 exhaust manifold heat insulator with the 3 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH Installation

4. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR Installation

5. INSTALL OIL LEVEL DIPSTICK GUIDE SUB-ASSEMBLY Installation

6. INSTALL OIL LEVEL DIPSTICK SUB-ASSEMBLY Installation

7. INSTALL ENGINE AND TRANSMISSION

Installation.