Do you have access to Mitchell1 Prodemand? If you are willing to share user/password (we can pay $250), please get in contact with us ASAP: email operation-charm [[at]] tuta.io or click to submit anonymously
Positive: Service and Repair
Battery Positive and Negative Cable Replacement (LY7 3.6L)
Removal Procedure
1. Release the electronic control module (ECM) bracket from the battery cover and set it aside with the ECM still connected. Refer to Engine Control Module Replacement (LE5 2.4L) (Service and Repair) .
2. Release the battery cover retaining tabs (2) and remove the battery cover (1).
3. Loosen the battery positive and negative cable nuts (2,3) and remove the battery positive and negative cables from the battery.
4. Remove the battery negative cable ground nut (1) and remove the battery negative cable ground from the body ground stud.
5. Remove the battery positive cable junction block nut (1) and remove the battery positive cable from the junction block.
6. Remove the engine wiring harness ground bolt (1) and the battery negative cable ground at the back of the left side cylinder head.
7. Remove the battery positive and negative cable bracket bolt (2).
8. Remove the starter solenoid BAT terminal nut (3) and remove the battery positive cable from the starter solenoid BAT stud.
9. Remove the battery positive and negative cable from the vehicle.
10. Transfer the battery current sensor if replacing the battery positive and negative cable. Refer to Battery Current Sensor Replacement (Service and Repair) .
Installation Procedure
Important: Route the battery positive and negative cable the same way as originally installed.
1. Install the battery positive and negative cable to the vehicle.
Notice: Refer to Fastener Notice (Fastener Notice) .
2. Install the battery positive cable to the starter solenoid BAT stud and install the starter solenoid BAT terminal nut (1).
Tighten the nut to 15 N.m (11 lb ft).
3. Install the battery positive and negative cable bracket bolt (2).
Tighten the bolt to 10 N.m (89 lb in).
4. Install the battery negative cable ground and engine wiring harness ground bolt (1) at the back of the left side cylinder head.
Tighten the bolt to 25 N.m (18 lb ft).
5. Install the battery positive cable to the junction block and install the battery positive cable junction block nut (1).
Tighten the nut to 15 N.m (11 lb ft).
6. Install the battery negative cable ground to the body ground stud and install the battery negative cable ground nut (1).
Tighten the nut to 10 N.m (89 lb in).
7. Install the battery negative and positive cables to the battery and install the battery positive and negative cable nuts (2,3).
Tighten the nuts to 5 N.m (45 lb in).
8. Align and install the battery cover (1) until the battery cover retaining tabs (2) lock into place.
9. Position the ECM bracket in place. Refer to Engine Control Module Replacement (LE5 2.4L) (Service and Repair) .