Operation CHARM: Car repair manuals for everyone.

Installation








2UZ-FE INTAKE: VACUUM SWITCHING VALVE (for ACIS): INSTALLATION

INSTALLATION

1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(a) Connect the VSV connector.





(b) Install the VSV connector and VSV to the intake manifold with the 2 bolt.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
(c) Connect the 2 vacuum hoses to the VSV.
2. INSTALL INTAKE MANIFOLD Installation
3. INSTALL FUEL MAIN TUBE Installation
4. INSTALL FUEL RETURN TUBE Installation
5. INSTALL NO. 2 WATER BY-PASS PIPE Installation
6. INSTALL NO. 1 BRAKE BOOSTER TUBE Installation
7. INSTALL AIR CLEANER HOSE ASSEMBLY Installation
8. ADD ENGINE COOLANT Service and Repair
9. INSPECT FOR COOLANT LEAK Testing and Inspection
10. CHECK FOR FUEL LEAK Installation
11. INSTALL NO. 1 ENGINE UNDER COVER Replacement
12. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY Installation
13. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY Installation
14. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY Installation
15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE: Some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.