Installation
INTERIOR PANELS / TRIM: FRONT CONSOLE BOX (for 1GR-FE): INSTALLATION
HINT
A bolt without a torque specification is shown in the standard bolt chart Standard Bolt - Specified Torque For Standard Bolts.
1. INSTALL REAR CONSOLE BOX ASSEMBLY
(a) Connect each connector.
(b) Attach the 2 guides to install the rear console box.
(c) Install the 4 bolts.
2. INSTALL NO. 2 CONSOLE BOX RETAINER
(a) Attach the clips, 2 claws and 2 guides to install the No. 2 console box retainer.
3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
(a) Connect each connector.
(b) Attach the 10 clips to install the upper console panel.
4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A)
(a) Install the shift lever knob and twist it in the direction indicated by the arrow.
5. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
(a) Install the shift lever knob and twist it in the direction indicated by the arrow.
6. INSTALL FRONT NO. 1 CONSOLE BOX INSERT
(a) Attach the 2 clips and guide to install the front No. 1 console box insert.
7. INSTALL FRONT NO. 2 CONSOLE BOX INSERT
(a) Attach the 2 clips and guide to install the front No. 2 console box insert.
8. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
(a) Attach the 5 clips to install the No. 1 instrument cluster finish panel garnish.
9. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
HINT
Use the same procedure described for the No. 1 instrument cluster finish panel garnish.