Operation CHARM: Car repair manuals for everyone.

Installation





INTERIOR PANELS / TRIM: FRONT CONSOLE BOX (for 1GR-FE): INSTALLATION

HINT
A bolt without a torque specification is shown in the standard bolt chart Standard Bolt - Specified Torque For Standard Bolts.

1. INSTALL REAR CONSOLE BOX ASSEMBLY

(a) Connect each connector.

(b) Attach the 2 guides to install the rear console box.

(c) Install the 4 bolts.

2. INSTALL NO. 2 CONSOLE BOX RETAINER

(a) Attach the clips, 2 claws and 2 guides to install the No. 2 console box retainer.

3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY

(a) Connect each connector.

(b) Attach the 10 clips to install the upper console panel.









4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A)





(a) Install the shift lever knob and twist it in the direction indicated by the arrow.

5. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY





(a) Install the shift lever knob and twist it in the direction indicated by the arrow.

6. INSTALL FRONT NO. 1 CONSOLE BOX INSERT

(a) Attach the 2 clips and guide to install the front No. 1 console box insert.

7. INSTALL FRONT NO. 2 CONSOLE BOX INSERT

(a) Attach the 2 clips and guide to install the front No. 2 console box insert.

8. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH

(a) Attach the 5 clips to install the No. 1 instrument cluster finish panel garnish.

9. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH

HINT
Use the same procedure described for the No. 1 instrument cluster finish panel garnish.