Installation
POWER STEERING: VANE PUMP (for 1GR-FE): INSTALLATION
1. INSTALL VANE PUMP
(a) Install the vane pump assembly with the 2 bolts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(b) Install the wire harness clamp bracket with the bolt.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the oil pressure switch connector.
NOTICE:
Make sure that no oil adheres to the connector.
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a new gasket onto the pressure feed tube.
(b) Install the pressure feed tube with the union bolt.
Torque : 51 Nm (520 kgf-cm, 38 ft-lbf)
3. CONNECT OIL RESERVOIR TO PUMP HOSE NO. 1
(a) Connect the oil reservoir to pump hose No. 1 with the clip.
4. INSTALL FAN & GENERATOR V BELT Installation
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)
Service Precautions
6. ADD POWER STEERING FLUID
7. BLEED POWER STEERING FLUID Power Steering System
8. CHECK FOR POWER STEERING FLUID LEAKAGE
9. INSTALL ENGINE UNDER COVER SUB-ASSEMBLY NO. 1 (for 4WD and Pre-Runner)
Torque : 30 Nm (306 kgf-cm, 22 ft-lbf)