Operation CHARM: Car repair manuals for everyone.

Removal








1ZZ-FE ENGINE MECHANICAL: DRIVE BELT: REMOVAL

REMOVAL

1. REMOVE ENGINE UNDER COVER RH
2. REMOVE FAN AND GENERATOR V BELT





(a) Turn the drive belt tensioner clockwise to relieve tension on the belt, and then remove the belt.
(b) Carefully return the tensioner to the unloaded position.

NOTICE:
- When retracting the tensioner, turn it clockwise slowly in 3 sec. or more. Be sure not to apply force rapidly.
- After the tensioner is retracted all the way, do not apply force any more than necessary.