Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation








2AZ-FE EMISSION CONTROL: PCV VALVE: INSTALLATION

INSTALLATION

1. INSTALL VENTILATION VALVE SUB-ASSEMBLY





(a) Apply adhesive to 2 or 3 threads of the ventilation valve.
Adhesive:
Toyota genuine adhesive 1324, three bond 1324 or equivalent





(b) Using a 22 mm deep socket wrench, install the ventilation valve.
Torque: 19 Nm (194 kgf-cm, 14 ft-lbf)
2. CONNECT NO. 2 VENTILATION HOSE





(a) Connect the No. 2 ventilation hose.
3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation
4. INSPECT FOR OIL LEAK