Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation





2AZ-FE EMISSION CONTROL: PCV VALVE: INSTALLATION

1. INSTALL VENTILATION VALVE SUB-ASSEMBLY

(a) Apply adhesive to 2 or 3 threads of the ventilation valve.





Adhesive:

Toyota genuine adhesive 1324, three bond 1324 or equivalent

(b) Using a 22 mm deep socket wrench, install the ventilation valve.





Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)

2. CONNECT NO. 2 VENTILATION HOSE

(a) Connect the No. 2 ventilation hose.





3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation

4. INSPECT FOR OIL LEAK