Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation





2ZR-FXE ENGINE CONTROL: ECM: INSTALLATION

1. INSTALL ECM

(a) Install the ECM with the 2 bolts.





Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)

(b) Install the 3 wire harness clamps.





(c) Connect the 2 ECM connectors.

(1) Connect the 2 ECM connectors and lower the 2 levers.





NOTICE:
* When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
* Make sure that the 2 levers are securely locked.

(2) Install the 2 wire harness clamps.

(d) Install the No. 2 engine room wire with the bolt.





Torque : 8.3 Nm (85 kgf-cm, 73 in-lbf)

(e) Slide the side cover down and engage the 2 claws to install it.





(f) Slide the engine room wire harness down and engage the 2 claws to install it.





(g) Connect the 3 wire harness connectors.





(h) Install the No. 1 relay block cover.

2. INSTALL INVERTER RESERVE TANK ASSEMBLY

(a) Install the inverter reserve tank assembly with the 2 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

3. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

4. INSTALL DECK FLOOR BOX RH Installation

5. INSTALL REAR NO. 3 FLOOR BOARD Installation