Operation CHARM: Car repair manuals for everyone.

Installation





2ZR-FXE INTAKE / EXHAUST: EXHAUST PIPE: INSTALLATION

1. INSTALL FRONT EXHAUST PIPE ASSEMBLY

NOTICE:
When installing the water hose, ensure that the exhaust heat recirculation system is filled with coolant. Otherwise, the engine water pump assembly may be damaged.

(a) Using a vernier caliper, measure the free length of the compression springs.









HINT
If the free length is less than minimum, replace the compression spring.

(b) Fully insert a new gasket to the exhaust manifold.

(c) Using a plastic hammer and wooden block, tap in the new gasket until its surface is flush with the exhaust manifold.





Text in Illustration





NOTICE:
* Be careful with the installation direction of the gasket.
* Do not reuse the gasket.
* Do not damage the gasket.
* Do not push in the gasket by using the exhaust pipe when connecting it.

(d) Connect the front exhaust pipe assembly to the 3 exhaust pipe supports.

(e) Install the front exhaust pipe assembly with the 2 bolts and 2 compression springs.

Torque : 43 Nm (440 kgf-cm, 32 ft-lbf)

(f) Connect the 2 heater water hoses.

2. INSTALL HEATED OXYGEN SENSOR Installation

3. INSTALL FRONT CENTER FLOOR BRACE

(a) Install the front center floor brace with the 4 bolts.

Torque : 51 Nm (520 kgf-cm, 38 ft-lbf)

4. INSTALL FRONT NO. 3 ENGINE UNDER COVER Installation

5. INSTALL TAIL EXHAUST PIPE ASSEMBLY

(a) Using a vernier caliper, measure the free length of the compression springs.









HINT
If the free length is less than minimum, replace the compression spring.

(b) Fully insert a new gasket to the front exhaust pipe assembly.

(c) Using a plastic hammer and wooden block, tap in the new gasket until its surface is flush with the front exhaust pipe assembly.





Text in Illustration





NOTICE:
* Be careful with the installation direction of the gasket.
* Do not reuse the gasket.
* Do not damage the gasket.
* Do not push in the gasket by using the exhaust pipe when connecting it.

(d) Connect the tail exhaust pipe assembly to the 2 exhaust pipe supports.

(e) Install the tail exhaust pipe assembly with the 2 bolts and 2 compression springs.

Torque : 43 Nm (440 kgf-cm, 32 ft-lbf)

6. ADD COOLANT (for Engine) Coolant (for Engine)

7. INSPECT FOR COOLANT LEAK (for Engine) Cooling System

8. INSPECT FOR EXHAUST GAS LEAK