Back-Up Light Circuit
LIGHTING (EXT): LIGHTING SYSTEM: Back-up Light Circuit
- Back-up Light Circuit
DESCRIPTION
The power management control ECU controls the back-up lights.
WIRING DIAGRAM
INSPECTION PROCEDURE
NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
1. CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - AUXILIARY BATTERY AND BODY GROUND)
(a) Disconnect the 1H No. 1 integration relay connector.
(b) Measure the voltage and resistance according to the value(s) in the table below.
Standard Voltage:
Standard Resistance:
(c) Disconnect the 1G No. 1 integration relay connector.
(d) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
2. CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - POWER MANAGEMENT CONTROL ECU)
(a) Disconnect the A21 power management control ECU connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
3. CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - REAR COMBINATION LIGHT ASSEMBLY)
(a) Disconnect the S18 or R17 rear combination light assembly connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
4. REPLACE NO. 1 INTEGRATION RELAY
(a) Temporarily replace the No. 1 integration relay with a new or normally functioning one Removal.
(b) Check that the back-up lights operate normally.
OK:
The back-up lights operate normally.
NG -- PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Exterior Lighting System
OK -- END (NO. 1 INTEGRATION RELAY WAS DEFECTIVE)