Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Shift Interlock Switch: Testing and Inspection




Park Pin Switch Test

1. Remove the center console panel Center Console Panel Removal/Installation.

2. Disconnect the 6P connector (A) from the A/T shift lock solenoid/park pin switch/A/T gear position indicator panel light connector (B).





3. Check for continuity between terminals No. 1 and No. 2.

- There should be continuity when the shift lever is moved out of P.
- There should be no continuity when the shift lever is moved to P.

4. If the continuity is not as specified, check the shift cable adjustment Adjustments. If the cable adjustment is OK, replace the park pin switch Shift Lock Solenoid Test.