Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Air Conditioning Switch: Service and Repair


BROUGHAM

1. Disconnect thermostatic cycling switch harness lead. Remove mounting screws.
2. Remove insulation at capillary line to evaporator inlet pipe connection.
3. After noting location of capillary line on pipe for installation, loosen and remove capillary line retaining clamps.
4. Clean evaporator inlet pipe with suitable solvent.
5. Position thermostatic switch on module, and install mounting screws. Connect switch harness lead.
6. Position capillary line on evaporator inlet pipe to within 1/2 inch of original location.
7. Place clamps over capillary line so line is covered by width of clamp. Tighten clamps to 20 inch lbs. Ensure both rows of capillary tube rest against evaporator inlet pipe.
8. Recover connection with new insulation.