Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Bank 2

Secondary AIR Injection Control Pipe Replacement

REMOVAL PROCEDURE




1. Remove the vacuum connections from the AIR check valve.
2. Loosen and lower the pinch clamp holding the AIR exhaust hose to the front AIR check valve.




3. Remove the nuts and the bolt (3) retaining the AIR check valve bracket to the engine.
4. Remove the nuts retaining the AIR check valve (2) to exhaust manifold pipe to the exhaust manifold (6).
5. Remove the exhaust manifold pipe (1) from the AIR check valve (2).

INSTALLATION PROCEDURE

NOTE: Refer to Fastener Notice in Service and Precautions.




1. Install the exhaust manifold pipe (1) to the front AIR check valve (2).

Tighten
Tighten the nuts to 9 N.m (80 lb in).

2. Install the exhaust manifold pipe (1), gasket, and retaining nuts (5) to the exhaust manifold (6).

Tighten
Tighten the nuts to 9 N.m (80 lb in).

3. Install the bolt and nuts retaining the AIR check valve bracket to the engine.

Tighten
Tighten the nuts and the bolt to 9 N.m (80 lb in).




4. Install the AIR exhaust hose and clamp assembly to the AIR check valve.
5. Reconnect the AIR vacuum connections.