Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Bank 2

REMOVAL PROCEDURE
1. Remove the air cleaner assembly.
2. Disconnect the vacuum lines.
3. Loosen and lower the pinch clamp connecting the bank 2 intermediate pipe/hose to the bank 2 shut-off valve.
4. Disconnect the hose from the shut-off valve.
5. Remove the two nuts securing the bank 2 secondary air injection (AIR) shut-off to the bracket.
6. Remove the bank 2 AIR shut-off valve from the bracket.

INSTALLATION PROCEDURE
1. Install the bank 2 AIR shut-off valve and new gasket to the bank 2 outlet pipe.

NOTE: Refer to Fastener Notice in Service Precautions.

2. Install the two nuts securing the shut-off valve to the bracket.

Tighten
Tighten the three nuts to 9 N.m (80 lb in).

3. Install the bank 2 intermediate pipe/hose and clamp to the shut-off valve.
4. Install the vacuum lines.
5. Install the air cleaner assembly.