16. Front End Play Check
^ Tools Required- J 8001-3 Dial Indicator
- J 25025-B Guide Pin Set
- J 28585 Snap Ring Remover
1. Assemble the J 25025-B by attaching the threaded rod and the dial indicator holder to one of the bolt holes on the transmission case.
2. Assemble the J 8001-3 onto the dial indicator holder. Index the J 8001-3 to the end of the turbine shaft (502).
3. Eliminate any slack by pressing down on the turbine shaft (502).
4. Apply upward pressure on the output carrier with the J 28585, until feel free play in retainer ring is "taken up".
5. Set the J 8001-3 to 0.
6. Pull up on the turbine shaft (502) while holding up the output carrier with the J 28585. The correct end play is between 0.102-0.559 mm (0.004-0.022 inch).
7. Record this measurement for future reference.
8. Remove the tools.