Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Bank 1

Secondary Air Injection (AIR) Shut-Off Valve Replacement - Bank 1

REMOVAL PROCEDURE
1. Raise the vehicle. Refer to Vehicle Lifting.







2. Remove the two nuts securing the outlet pipe to the exhaust manifold.
3. Lower the vehicle.







4. Disconnect the bank 1 intermediate pipe/hose from the bank 1 AIR shut-off valve.







5. Remove the vacuum lines connected to the bank 1 AIR shut-off valve.







6. Remove the three bolts securing the AIR shut-off valve to the engine.
7. Remove the AIR shut-off valve from the bank 1 AIR outlet pipe.








INSTALLATION PROCEDURE
1. Connect the bank 1 AIR shut-off valve with a new gasket to the bank 1 AIR outlet pipe.
2. Install the three bolts securing the bank 1 AIR shut-off valve to the engine.

NOTE: Refer to Fastener Notice in Service Precautions. Vehicle Damage Warnings


Tighten
Tighten the three bolts to 9 N.m (80 lb in).







3. Install the vacuum lines.







4. Reconnect the bank 1 AIR intermediate pipe/hose and clamp to the bank 1 AIR shut-off valve.
5. Raise the vehicle. Refer to Vehicle Lifting.







6. Install the two nuts securing the bank 1 AIR outlet pipe to the exhaust manifold.

Tighten
Tighten the two nuts to 9 N.m (80 lb in).

7. Lower the vehicle.