Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Valve Clearance: Adjustments

Fig. 7 Valve adjustment:





1. Remove valve covers as described under ``Rocker Arms & Pushrods, Replace.''
2. Crank engine until mark on torsional damper is aligned with ``0'' mark on timing tab fastened to crankcase front cover. Ensure engine is at No. 1 cylinder firing position by placing fingers on No. 1 cylinder valves as mark on damper approaches ``0'' mark on timing tab. If valves are not moving, engine is in the No. 1 cylinder firing position. If valves are moving, engine is in the No. 4 cylinder firing position and should be rotated one revolution to the No. 1 position.
3. With engine in No. 1 cylinder firing position, adjust the following valves: exhaust, 1, 5 and 6; intake, 1, 2 and 3. To adjust valves, back off adjusting nut until lash is felt at pushrod, then tighten nut until all lash is removed. This can be determined by rotating pushrod while turning adjusting nut, Fig. 7. When all lash is removed, turn adjusting nut in one full turn to center lifter plunger.
4. Crank engine one full revolution until mark on torsional damper and ``0'' mark on timing tab are aligned. This is the No. 4 cylinder firing position. With engine in this position, adjust the following valves: exhaust, 2, 3 and 4; intake, 4, 5 and 6.
5. Install valve covers and related components, then start engine and check timing and idle speed.