| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Crankshaft, Renew | 4.2 | 0.0 | A | |
| Main Bearings, Renew | 2.0 | 0.0 | A | |
| Oil Pump, Renew | 1.4 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Tune-Up | 0.6 | 0.0 | A | |
| Rear Main Oil Seal, Renew | 1.1 | 0.0 | A | |
| Timing Chain or Gears, Renew | 2.0 | 0.0 | A | |
| One Cylinder |
| Right Bank | 11.8 | 8.6 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Left Bank | 10.8 | 7.9 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Both Banks | 15.7 | 11.3 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| All Cylinders |
| Right Bank | 12.7 | 9.4 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Left Bank | 12.1 | 8.7 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Both Banks | 17.6 | 12.7 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Note |
| To Grind Valves, Add | 2.8 | 2.0 | A | |