Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Connecting Rod Bearing: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Connecting Rod Bearing
Each Additional0.40.3AIncludes: R&I Oil Pan & Plastigage Bearing.
One Cylinder
Right Bank8.05.8AIncludes: R&I Oil Pan & Plastigage Bearing.
Left Bank8.05.9AIncludes: R&I Oil Pan & Plastigage Bearing.
Both Banks8.46.1AIncludes: R&I Oil Pan & Plastigage Bearing.
All Cylinders
Right Bank8.86.5AIncludes: R&I Oil Pan & Plastigage Bearing.
Left Bank8.86.6AIncludes: R&I Oil Pan & Plastigage Bearing.
Both Banks10.70.0AIncludes: R&I Oil Pan & Plastigage Bearing.
Main & Rod Bearings24.112.4AIncludes: R&I Engine, Oil Pan & Plastigage Bearings And Make All Necessary Adjustments.
NOTE
With Engine Block Heater, Add0.10.0A
With AC, Add0.80.0A