Manuals through 2025 now available!
Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.
LEMON is the spiritual successor to CHARM, I recommend you try it!
Link:
lemon-manuals.la or
lemon-manuals.org.ua
(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)
Or, hide this message:
temporarily or
permanently
Installation - Front
INSTALLATION 1.
Position the
blower motor resistor (1) into the HVAC housing (6).
2.
Install the two screws (3) that secure the
blower motor resistor to the HVAC housing. Tighten the screws to
2 Nm (17 in. lbs.).
3.
Connect the two wire connectors (2 and 5) to the
blower motor resistor.
4.
Install the glove box onto the instrument panel (4).
5.
Reconnect the negative battery cable.