Operation CHARM: Car repair manuals for everyone.

Installation







INSTALLATION





1. Install new O-ring onto PTU.
2. Apply RTV, 05010884AA, to the PTU O-ring.




NOTE: The sequence below should always be followed when installing the PTU

3. Install PTU into position.
4. Install PTU-to-transmission adaptor bolts (2) and tighten to 22 Nm (30 ft. lbs.).
5. Check and adjust PTU Fluid level. The PTU holds.8L (1.7 Pints.) of Mopar(R) 75W-90 Gear and Axle Lubricant.




6. Install the PTU Heat shield (3).
7. Install PTU-to-transaxle mount bracket upper bolts (1) and tighten to 54 Nm (40 ft. lbs.).




8. Install the lower heat shield bolt (2) and tighten to 22 Nm (30 ft. lbs.).




9. Install transmission rear mount bolts (2) and tighten to 54 Nm (40 ft. lbs.).
10. Install propeller shaft assembly. Propeller Shaft - Installation
11. Install exhaust to engine Catalytic Converter - Installation.
12. Install the crossmember Service and Repair.
13. Install right halfshaft assembly. Half Shaft - Installation