Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation







INSTALLATION






1. Lubricate the two rubber mount sockets (2) on the resonator (1) with Mopar(R) Rubber Bushing Installation Lube.

2. Install the resonator to the throttle body inlet. Push the resonator (1) down onto the two locating pins (3) on the right cylinder head cover until the rubber mount sockets (2) are fully seated.





3. Install the push pin (3).

4. Install the air inlet hose to the resonator (1) and tighten the clamp (4) to 4 Nm (35 in. lbs.).

5. Connect the electrical connector (2) to the Inlet Air Temperature (IAT) sensor.





6. Install engine cover (1).

7. Connect the negative battery cable and tighten nut to 5 Nm (45 in. lbs.).