Operation CHARM: Car repair manuals for everyone.

Installation - 4.0L






INSTALLATION - 4.0L




1. Be sure the O-ring (1) is still in place on the MTV shaft. If not, refer to the following step.




2. If O-ring is not on MTV shaft (from previous step), gently pry it (1) from intake manifold.




3. Carefully position the MTV assembly (5) straight rearward into the intake manifold. Align notch (2) on MTV assembly to locating tang (1) on intake manifold.

4. Install mounting bolts (3).

5. Connect electrical connector (4).