Operation CHARM: Car repair manuals for everyone.

Initial Engagement Tests

INITIAL ENGAGEMENT TESTS

NOTE: Initial engagement tests are made to determine if initial band and clutch engagements are smooth.

1. Run the engine until its normal operating temperature is reached.
2. With the engine at correct idle speed, shift selector lever from Neutral to the various driving ranges. Observe the initial band and clutch engagements.
3. Band and clutch engagements should be smooth in all positions.
4. Rough initial engagements are caused by high engine idle speed or high control pressures.