Rocker Arm Assembly: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| One | 0.2 | 0.1 | B | After valve Covers Are Removed. |
| All | ||||
| One Bank | 0.7 | 0.4 | B | After valve Covers Are Removed. |
| Both Banks | 0.9 | 0.6 | B | After valve Covers Are Removed. |
| Note | ||||
| If Necessary to Tilt Engine for Push Rods on Cylinders 3 & 5, Add | 2.2 | 1.6 | B | After valve Covers Are Removed. |