Operation CHARM: Car repair manuals for everyone.

Push Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All Cylinders
One Bank0.70.4BAfter valve Covers Are Removed.
Both Banks0.90.6BAfter valve Covers Are Removed.
One0.20.1BAfter valve Covers Are Removed.
Note
If It Is Necessary to Tilt
The Engine to Replace the
Push Rods on Number 3 & 5 Cylinders, Add2.21.6B