Operation CHARM: Car repair manuals for everyone.

Rocker Arm Assembly: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One0.20.1BAfter valve Covers Are Removed.
All One Bank0.70.4BAfter valve Covers Are Removed.
All Both Banks0.90.6BAfter valve Covers Are Removed.
Note
If It Is Necessary to Tilt
The Engine to Replace the
Push Rods on Cylinders 3 & 5, Add2.21.6B