Cruise Control Switch: Testing and Inspection
NOTE: To test speed control actuator switch, perform the following voltage and resistance measurements.Speed Control Switch Assembly Voltage Specifications.:
For voltage measurements, remove 14401 harness connector from speed control servo, then connect negative lead of voltmeter to Pin 10 (circuit 676 PK/O) of connector. Measure DC or AC voltage of circuits listed with positive lead of meter.
Speed Control Actuator Switch Resistance Measurements.:
For resistance measurements, remove 14401 harness connector at speed control servo, then connect an ohmmeter between the designated circuits with ignition switch off.