Instrument Panel - Clock Finish Panel
RH
Removal and Installation
1. Remove clock finish panel by holding and pushing upward on front of clock finish panel.
2. Pull forward to disengage rear clip.
3. Disconnect wiring to clock.
4. Remove two screws retaining clock finish panel to clock.
5. To install, reverse Removal procedure.
CENTER
Removal and Installation
1. Remove instrument panel finish panel.
2. Remove radio and CD player.
3. Remove console finish panel from the top of console.
4. Remove two screws retaining bottom of instrument panel finish panel to instrument panel.
5. Remove one screw retaining rear side of instrument panel finish panel.
6. Use thin tool to insert above registers, pull down and out to release retaining clips.
7. Pull instrument panel finish panel to unsnap two clips left and right of the air conditioner control and two snaps above the register.
8. Pull instrument panel finish panel away from instrument panel and disconnect wiring and EATC sniffer hose as required.
9. To install, reverse Removal procedure.