L1
L1 CHECK I/P FUSE 14 (10A)Measuring Voltage Between Pins 1 And 16:
- Check continuity at I/P fuse 14 (10A).
- Is the fuse OK?
> Yes
Go to Pinpoint Test L2. L2
> No
Replace I/P fuse 14 (10A). Go to System Precheck. Initial Inspection and Diagnostic Overview