Operation CHARM: Car repair manuals for everyone.

Valve: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Resurface/Grind
Left Bank9.85.3AIncludes: R&I Cylinder Head And Make All Necessary Adjustments.
Both Banks14.78.4AIncludes: R&I Cylinder Head And Make All Necessary Adjustments.
Right Bank9.85.8AIncludes: R&I Cylinder Head And Make All Necessary Adjustments.
NOTE
To Knurl Valve Guides, Add
One0.10.0A
To Renew Timing Chain and/ or Gears, Add3.70.0A
To Renew Hydraulic Valve Lifters, Add
Right Bank1.80.0A
Left Bank1.80.0A
Both Banks2.10.0A
To Ream Valve Guides, Add0.10.0A
To Renew Valve Guides, Add
One0.20.0A
To Renew Camshaft, Add4.30.0A
With AC, Add0.20.0A