| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Diagnose/Test |
AODE-W/4R70W/4R75W |
Transmission, Diagnosis | 1.8 | 0.0 | B | Includes: Time To Hook-Up And Disconnect Test Equipment. Checking System For Fault Codes, Road Test And Hydraulic Pressure Test As Required. |
Oil Leak, Diagnosis | 0.6 | 0.5 | B | Includes: Clean And Dry Outside Of Case And Operating Unit To Determine Point Of Leakage. |
4R100 |
Transmission, Diagnosis | 1.8 | 0.0 | A | Includes: Time To Hook-Up And Disconnect Test Equipment. Checking System For Fault Codes, Road Test And Hydraulic Pressure Test As Required. |
Oil Leak, Diagnosis | 0.6 | 0.5 | B | Includes: Clean And Dry Outside Of Case And Operating Unit To Determine Point Of Leakage. |
Replace |
4R100 |
Complete Assembly Without Transfer Of Parts | 4.6 | 3.5 | B | Includes: Remove 4WD Transfer Case Prior To Removal Of Transmission. |
NOTE |
To R&R Driveplate, Add | 0.2 | 0.1 | B | |
To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
Complete Assembly With Transfer Of Parts | 5.2 | 3.8 | B | Includes: Remove 4WD Transfer Case Prior To Removal Of Transmission. |
NOTE |
To R&R Driveplate, Add | 0.2 | 0.1 | B | |
To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
To Flush Cooler Lines, Add | 0.6 | 0.0 | B | |
AODE-W/4R70W/4R75W |
Complete Assembly Without Transfer Of Parts |
4R70W | 4.6 | 3.1 | B | |
NOTE |
To R&R Driveplate, Add | 0.2 | 0.0 | B | |
To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
Complete Assembly With Transfer Of Parts |
4R70W | 5.2 | 3.4 | B | |
NOTE |
To R&R Driveplate, Add | 0.4 | 0.2 | B | |
To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
To Flush Cooler Lines, Add | 0.6 | 0.0 | B | |
Note |
To R&R Input Shaft Seal, Add | 0.2 | 0.0 | B | |
Overhaul/Rebuild |
AODE-W/4R70W/4R75W |
4R70W | 10.5 | 7.1 | A | Includes: R&I Transmission. |
NOTE |
To Overhaul Valve Body, Add |
With 4R70W | 0.9 | 0.7 | A | |
To R&R Torque Converter, Add | 0.2 | 0.0 | A | |
To Flush Cooler Lines, Add | 0.6 | 0.0 | A | |
4R100 | 11.9 | 8.8 | A | Includes: R&I Transmission. |
NOTE |
To Overhaul Valve Body, Add | 1.5 | 0.0 | A | |
To R&R Torque Converter, Add | 0.2 | 0.0 | A | |
To Flush Cooler Lines, Add | 0.6 | 0.0 | A | |