Generator - Dual Generator
GENERATOR - DUAL GENERATORRemoval and Installation
NOTE: This procedure applies to the secondary generator of the dual generator system.
1. Disconnect the batteries.
2. Loosen the 2 clamps and remove the charge air cooler (CAC) pipe.
- To install, tighten to 12 Nm (9 lb-ft).
3. Remove the cooling fan.
4. Rotate the accessory drive belt tensioner clockwise and remove the drive belt from the generator pulley.
5. Remove the nut and position the generator B+ terminal aside.
- To install, tighten to 8 Nm (71 lb-in).
6. Disconnect the generator electrical connector.
7. Remove the 3 bolts and the generator.
- To install, tighten to 47 Nm (35 lb-ft).
8. To install, reverse the removal procedure.