Pinpoint Tests
PINPOINT TESTS A: THE CLOCK OPERATION IS INOPERATIVEA1:
A1-A3:
A4:
Normal Operation
The clock receives battery voltage from the smart junction box (SJB) through circuit SBP14 (BN/RD). Ground for the clock is supplied through circuit GD138 (BK/WH).
Possible Causes
- Fuse
- Circuit SBP14 (BN/RD) open
- Circuit GD138 (BK/WH) open
- Clock
- SJB