Component Tests and General Diagnostics
ROOF OPENING PANEL SWITCH1. Measure the resistance.
2. Apply battery voltage to the roof opening panel control switch C9014-1, component side, and ground to the roof opening panel control switch C9014-6, component side. The LED should illuminate.
3. If all measurements of the roof opening panel control switch are as shown, return to the pinpoint test. Otherwise, install a new roof opening panel control switch.