Do you have access to Mitchell1 Prodemand? If you are willing to share user/password (we can pay), please get in contact with us ASAP (truly, it is urgent): email operation-charm [[at]] tuta.io or click to submit anonymously
Test O: The High Beam Indicator Is Never On
PINPOINT TEST O: THE HIGH BEAM INDICATOR IS NEVER ONNormal Operation
The high beam indicator receives voltage through circuit 12 (LG/BK) when the high beams are on. The high beam indicator is grounded through the instrument cluster (IC) bulb ground circuit 57 (BK).
This pinpoint test is intended to diagnose the following:
- Wiring, terminals or connectors
- Instrument cluster (IC)