Installation
EngineInstallation
All vehicles
CAUTION: If used as a leverage device, the fuel rail may be damaged. Care must be taken when working around the fuel rail.
1. Install the engine, remove the floor crane and the Spreader Bar.
2. Remove the Engine Lifting Brackets.
3. Install the LH engine insulator nuts.
^ Tighten to 110 Nm (81 lb-ft).
4. Install the RH engine insulator nuts.
^ Tighten to 110 Nm (81 lb-ft).
5. NOTE: Automatic transmission shown, manual transmission similar.
Install the 8 transmission-to-engine bolts.
^ Tighten to 47 Nm (35 lb-ft).
6. If equipped with A/C, position the A/C tube bracket and install the nut.
^ Tighten to 20 Nm (15 lb-ft).
7. NOTE: LH shown, RH similar.
Install the 4 exhaust manifold-to-dual converter Y-pipe nuts.
^ Tighten to 40 Nm (30 lb-ft).
8. Connect the RH heated oxygen sensor (HO2S) electrical connector.
9. Connect the LH HO2S electrical connector.
10. Install a new engine oil filter.
11. Route the transmission wiring harness from the top of the engine to the transmission.
12. Attach the wiring harness to the crossmember and connect the electrical connector.
Vehicles equipped with a manual transmission
13. Connect the transmission and LH catalyst monitor sensor electrical connectors and attach the wiring harness retainers.
14. Route the wiring harness over the transmission and position the bracket on the stud. Install the nut and connect the RH catalyst monitor sensor electrical connector.
^ Tighten to 10 Nm (89 lb-inch).
Vehicles equipped with an automatic transmission
15. Install the 4 torque converter nuts.
^ Tighten to 47 Nm (35 lb-ft).
16. Position the transmission cooling tube bracket and install the bolt.
^ Tighten to 47 Nm (35 lb-ft).
17. Connect the transmission and LH catalyst monitor sensor electrical connectors. Attach the wiring harness retainers.
18. Route the wiring harness over the transmission and position the bracket on the stud. Install the nut and connect the RH catalyst monitor sensor electrical connector.
^ Tighten to 10 Nm (89 lb-inch).
19. Position the transmission level indicator tube and install the nut.
^ Tighten to 23 Nm (17 lb-ft).
All vehicles
20. NOTE: Rear wheel drive (RWD) vehicle shown, four wheel drive (4WD) vehicle similar.
Install the engine wiring harness bracket and bolt and connect the oil pressure switch electrical connector.
^ Tighten to 10 Nm (89 lb-inch).
21. Install the starter motor.
22. Connect the heater hose.
23. Connect the heater hose.
24. Position the vacuum hose harness and connect the 2 vacuum hose ( shown). Install the crankcase breather hose.
25. Connect the vapor hose to the purge valve.
26. Position the ground wire and install the nut.
^ Tighten to 10 Nm (89 lb-inch).
27. Connect the 2 engine wiring harness electrical connectors.
28. Position the wiring harness and install the bolt.
^ Tighten to 10 Nm (89 lb-inch).
29. Connect the generator wiring and install the generator terminal nut.
^ Tighten to 8 Nm (71 lb-inch).
30. Position the A/C compressor and power steering bracket and install the bolts.
^ Tighten to 42 Nm (31 lb-ft).
31. NOTE: The battery is removed for clarity.
Connect the power steering return hose to the power steering fluid reservoir.
32. Connect the power steering high pressure hose to the lower power steering pump fitting.
33. If equipped with A/C, position the A/C compressor manifold and install the bolt.
^ Tighten to 20 Nm (15 lb-ft).
34. If equipped with A/C connect the A/C high pressure switch electrical connector.
35. If equipped with A/C, connect the A/C field coil electrical connector.
36. Install the accessory drive belt.
37. NOTE: Do not fill the cooling system at this time.
Install the radiator.
38. Install the air cleaner housing cover.
39. Connect the mass air flow (MAF) sensor.
40. Install the fan blade.
41. Install the hood.
42. Position the RH spark plug wires and attach the retainer to the RH valve cover stud. Coat the inside of the spark plug wire boots with Silicone Brake Caliper Grease and Dielectric Compound and connect the spark plug wires to the correct spark plugs.
43. Position the ignition coil, the bracket and the LH spark plug wires and attach the spark plug wire retainer to the LH vale cover stud. Coat the inside of the spark plug wire boots with Silicone Brake Caliper Grease and Dielectric Compound and connect the spark plug wires to the correct spark plugs.
44. Connect the fuel tube spring lock couplings.
45. Install the intake manifold.
46. Connect the battery ground cable.
47. Fill the engine to the correct oil level with clean engine oil.
48. Fill the engine cooling system.
49. Fill the power steering system.
50. If equipped with A/C, recharge the A/C system.